DHL G Park Multi User Distribution Centre

Back to Case Studies

Case Study Details

Date
March 2011
Client
DHL
Value
£2m
Service Type
Location
Liverpool

Client’s Requirements

DHL developed this new distribution centre as a joint venture with MetLife Real Estate Investments. It was the first unit to be constructed within the 44 acre G.Park Liverpool site. The construction of the multi user warehouse was completed in March 2011.

This 33,645m2 (360,000 sq ft) building was to be used as a key distribution centre in the North West of England, taking full advantage of access to the regional and national motorways, most importantly the M6 and M62.

The warehouse needed to be fitted out to facilitate an environmentally controlled racked storage facility.  In addition there was a requirement to fit out a three storey office accommodation block and new transport office

Silcock Leedham’s Contribution

Our duties included:

  • The completion of a dilapidation Survey
  • Liaison with Utility Authorities
  • Mechanical and Electrical design duties through to construction and including the inclusion of a Sprinkler system
  • Site inspection, witnessing and snagging

Added Value / Unique Selling Points

We liaised with the base build design team to rectify issues from the pre-fit out and were also able to achieve minimal defects at the end of the project due to ensuring continuous inspection during construction.

We were under pressure to deliver the project to a tight timeframe and so we therefore ensured we worked cohesively with the contractors to achieve the required end date. Some of the areas were ready early enabling the client to move in pre-practical completion.